The assembly instructions for a staircase may vary depending on its type and shape.








To make installing your staircase even easier and safer, we’ve prepared a clear step-by-step video alongside the detailed installation manual. It will guide you through the entire process and provide practical tips to ensure a smooth and hassle-free installation. Watch the video and assemble your staircase professionally, quickly, and with confidence.
We wish you a successful installation!
1. Preparation for Installation
Before commencing the assembly, thoroughly study the floor plan of the staircase and verify the ceiling opening and dimensions against the plan. Take note of the wall structure, the ceiling structure, and the space available at the stair exit.
Check the completeness of all staircase parts, unpack them, inspect them, and familiarize yourself with their layout and position in the stairwell. Follow the same process for the fittings and auxiliary materials required for installation.
Prepare all necessary assembly tools and aids carefully. Read through the entire text beforehand to obtain a solid theoretical understanding of the complete workflow.
Personnel and Screwing Recommendations
2. Planning and Drilling Anchor Points
Installation begins by anchoring the 2nd outer string (exit string) to the wall. Because the anchoring holes are not pre-drilled, they must be planned so that they do not conflict with electrical installations, niches, or existing wall openings.
If mounting against framed walls featuring reinforcements or studs behind plasterboard or OSB panels, align the anchor points exactly with the centres of these reinforcements. Where necessary, two anchor points can be placed vertically one above the other to increase stability.
3. Aligning and Connecting the Outer Strings
Press the 2nd outer string (exit string) against the wall, guide it up to the exit edge, support it, and align it. The upper edge of the vertical timber beam on the string must sit lower than the final floor height of the upper floor by exactly the thickness of the tread. Verify that the exit edge is perfectly level using a spirit level.
Attention: Uneven floors at the stair exit are a frequent issue, even with screed floors. If the final story height has not yet been established, bring the string to the correct height using suitable shimming plates. Once properly positioned, secure the string by anchoring it at all planned points, but do not tighten the fasteners too firmly yet to maintain ease of alignment.
Next, glue the wooden dowels into the 1st outer string (ascent string) and screw the threaded rods into the 2nd outer string to link the strings at the outer corner. Coat the joint interface, especially the front face of the 1st outer string, with glue.
Slide the ascent string onto the threaded rods and wooden dowels, push it toward the corner and against the wall, support it, and align it carefully. Screw the collar nuts onto the threaded rods and tighten the corner connection securely.
If the floor height is not yet final, adjust the string elevation using suitable shimming plates. Check the levelness of the saddle for the treads across both strings with a spirit level and make corrections if necessary. Anchor the 1st outer string to the wall at all designated points without tightening the screws too firmly yet.
Important Geometric Note: Pay strict attention to the straightness of the string. Unevenness in the wall must not be transferred to the string; use shimming plates where necessary. The staircase is manufactured to be exactly rectangular in its floor plan. If the exit is not at a perfect right angle, the strings and the anchor plate must be shimmed to correct the angle, ensuring a precise installation of the steps, landing, and inner string.
4. Pre-assembling the Exit Section
Unlike configurations without risers, the exit block must be built structurally before final wall mounting:
5. Integrating the Exit Post
Attach the exit post to this pre-assembled section by sliding its housing over the exit step and seating it onto the wooden dowels on the front face of the string.
Prior to assembly, coat the housing and the contact surfaces facing the risers with silicone, and coat the dowel holes with glue. Screw the post firmly to the string using two 6×100 screws. Additionally, secure the exit step from the back of the post using a shorter screw.
6. Mounting and Anchoring the Exit Assembly
Guide the completed exit section to the exit edge, sliding the free ends of the steps onto the wooden dowels of the outer exit string, and tap the steps firmly into place. From the outer string side, secure the tread using a 6×60 screw driven into the hole under the second-to-last step.
The overlapping portion of the post on the inside must be hung onto the exit edge of the stair opening. Support the post, align it, and verify its levelness with a spirit level.
Plan and drill two anchor points and anchor the exit securely. This anchoring must pass through both the riser and the column together, aligned with the axis of the exit column. Ensure these anchor points are correctly positioned to avoid insulation and utility lines (electricity, water, or heating).
Status Check: The final two steps and their connecting riser are now joined to the exit strings, and the 2nd inner string (exit string) is connected to the post on the inside. This inner string currently remains only supported and is not yet permanently anchored.
7. Connecting and Aligning the Inner Strings
Glue the wooden dowels into the 1st inner string (ascent string) to connect the strings at the 1st inner corner. Coat the joint interface with glue, ideally on the front face of the ascent string. Lift this string and connect it in the inner corner to the already mounted 2nd inner string, securing the connection with two 6×100 screws.
Properly support and align the entire inner string assembly, just as was done for the outer sides. To accurately control the distance between the outer and inner strings, provisionally place a tread before the corner, another directly behind the corner, and tread No. 2 onto the wooden dowels. Verify the levelness during this test.
Once everything is correctly aligned, firmly anchor the ascent of the inner string to the floor under the first step using the floor anchor. The corresponding holes for this anchor are located under the 1st step.
Attention: Ensure that underfloor heating systems are strictly accounted for at this location!
Note: The floor anchor shares the hole on the side of the string with the future threaded bolt used to secure the first tread. Ensure that enough space remains for both components!
8. Installation of Step No. 1 (With Risers)
9. Step-by-Step Installation of the Remaining Treads
Mount the remaining treads progressively from the ascent upwards:
Pre-assembled Step Exception: Because the second-to-last step is already integrated into the exit section, the step and riser immediately below it must be mounted separately. Slide that specific riser diagonally from below into the groove of the pre-mounted second-to-last step first, and then seat its corresponding tread onto its wooden dowels.
9.1 Landing Installation
The landing is handled exactly like a standard tread during assembly. However, due to its larger width, it must be reinforced and secured with screws at multiple locations. Apply silicone to the corresponding faces, reinforce the joints with construction adhesive and wooden dowels, and fix the individual components using screws. The extra width simply requires more anchoring points to ensure a stable and secure installation.
10. Final Tightening and Structural Inspection
Completely tighten all anchor points across the strings, ensuring that all connections are permanently and properly fixed. Thoroughly check the geometry of the staircase to ensure that all connections are aligned, the structure is stable, and all dimensions are precisely met.
11. Installation of the Balustrade Posts
12. Installation of Bottom Rails, Balusters, and Handrails
13. Cleaning and Finishing Work
Clean the staircase thoroughly to remove dust and installation residues.
Cover all openings and connection holes with the custom-sized cover caps. Place the caps onto the holes with the rubber band side facing the edge of the hole and press them firmly by hand to lock them into place flush with the surface.
14. Curing Time
All glued and silicone-sealed connections require approximately 24 hours at normal room temperature to cure completely. Do not subject the staircase to structural loads or heavy foot traffic during this period.